Ökotherm company building

Excess energy in Austria’s foggiest area

Planning:
Ökotherm Heiz- und Klimasysteme GmbH

Four different types of heat pumps (ground direct evaporation, ground water, depth drilling, air) and two controlled ventilation systems supply the offices and seminar rooms of the plus-energy building in Schörfling (Upper Austria) with warmer and fresh air.

The 25 kW photovoltaic system on the southwest façade of the building and 36 m² of thermal solar cells on the roof provide green power and warmth. The building’s cement foundation plate contains five circuits for cement core activation (storage and removal of solar energy as required). The solid brick wall of the overall building is insulated with 12 cm of heavy-duty insulation. The photovoltaic cells are mounted on the thermal insulation. Together, this achieves a comfortable room climate in the 1750 m² of utilized space. Excess solar energy is used for the whirlpool and for keeping the driveway free of snow.

Basic data
projektAustria´s first plus-energy building
sizeca. 1750 m2
heating system heat pumps and solar thermal


Particular measures
four different types of heat pumps
two controlled ventilation systems
25 kWh photovoltaic system
36 m2 thermal solar cells
concrete core cooling

Energy consumption
consumption in kWh/m2 ano additional energy required
CO2-savings65 tons/year

Renovation to meet passive house standard with almost no additional costs.